PRESTON PARISH COUNCIL is holding a public event for village residents to see the proposed plans for the construction of two 55 metre high wind turbines (with a maximum tip-height of 85m) on land West Of the Limes Farm, Staithes Road, Saltend, Preston (South).

The proposed site location is to the North of the Yorkshire Water Waste Water Treatment Works – which already has one operational wind turbine.

Wiltshire-based Countryside Solutions, who are making the application, say that they have considered all the likely impacts of the development on the local landscape, including noise and the effects of the shadow-flicker from the rotating blades.

However, residents will be able to make their own minds up at the event on Tuesday 7th June 2011 which starts at 7pm at the Preston Community Hall.

One thought on “Proposed Wind Turbines on Staithes Road, Saltend – Preston Meeting

  1. I have just come across this site, how many other people of Preston didnt know about this, At the moment myself and another person are waitinfg to see what is gionG to be done ref Weghill road and H G V s, not only them but the speed that every one does, from the post office to the corner of East end road you may as well wave a starting flag, Its a path no wider than 1 mt, yet no one who can do anything, seems to be botherd. CAN YOU “”””I
    If I dont get answers next week I will be seeking advice from a friend in europe who himself wrote to the governing body and had a great responce., its our rights to be able to walk to the shops without putting our lifes in danger.
    If you cannot do anything some, I am sure some out there will look at this case

Leave a comment. You need to leave your FULL NAME.

Previous post Police Appeal – Theft of Motorcycle – Hedon
Next post Sunday Roadworks in Hedon – June/July 2011

Discover more from Hedon Blog

Subscribe now to keep reading and get access to the full archive.

Continue reading